Close Menu
The Startup StoryThe Startup Story
  • Business
  • Lifestyle
  • National
  • Education
  • Health
  • Technology
  • World

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY

October 26, 2026

Parsi Dairy Farm turns 110 and drops a Diwali rap

October 26, 2026

Pre-approved Loan Vs Instant Short-Term Loan: What’s the Difference and What Should Borrowers Compare?

October 26, 2026
Facebook X (Twitter) Instagram
Trending
  • Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY
  • Parsi Dairy Farm turns 110 and drops a Diwali rap
  • Pre-approved Loan Vs Instant Short-Term Loan: What’s the Difference and What Should Borrowers Compare?
  • RGIPT Celebrates 10th Convocation, Showcases Progress in Research, Innovation and Industry Collaboration
  • Malaysia Hosted Influential Leaders of Asia as Team Marksmen Celebrated Leadership That Shaped the Future
  • ICA | GemLab India inaugurates gemological laboratory in Surat
  • Power Creator Awards 2026: Ipsita Chowdhury wins Best Pet Friendly Content – Editor’s Choice
  • INA Solar Partners with US-Based Caelux in 3 GW Agreement; Targets 29% Module Efficiency by 2028
The Startup StoryThe Startup Story
  • Business
  • Lifestyle
  • National
  • Education
  • Health
  • Technology
  • World
The Startup StoryThe Startup Story
Home»Business»KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat
Business

KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat

By October 2, 2023No Comments
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Surat (Gujarat) [India], October 2: KP Energy Limited, a leading player in the renewable energy sector, has achieved a significant milestone by receiving a Notification of Award (NOA) from NTPC Renewable Energy Limited (NTPC REL) for a 464.10 MW Balance of System Package. This package is part of an Inter-State Transmission System (ISTS) Connected Wind Energy project in Gujarat.

KP Energy clinched the contract from NTPC REL, a subsidiary of NTPC, through a rigorous and highly competitive bidding process, reaffirming its excellence in the renewable energy domain. The project falls under the company’s Captive Power Producer (CPP) business segment.

Under the contracts, KP Energy will provide a comprehensive suite of services, including Engineering, Procurement, Construction, and Commissioning (EPCC). These services encompass the acquisition and transfer of land for the project, the supply of all necessary equipment for the balance of plant, and the provision of various services related to unloading, storage, on-site handling, installation, insurance, civil and allied works, integration into the grid, testing, and commissioning. Additionally, the company will be responsible for the operation and maintenance of the contract scope for three years, ensuring its optimal performance and reliability.

Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

Business
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related Posts

Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY

October 26, 2026

Parsi Dairy Farm turns 110 and drops a Diwali rap

October 26, 2026

Pre-approved Loan Vs Instant Short-Term Loan: What’s the Difference and What Should Borrowers Compare?

October 26, 2026

Comments are closed.

Top Posts

Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY

October 26, 2026

Can we guess, how much she is happy?

February 22, 2020

When sunrise and the day begins.

February 22, 2020

Make your own inhouse library and learn

February 22, 2020
Don't Miss
Business

Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY

By Arjun SinghOctober 26, 2026

Hyderabad (Telangana) [India], October 26: Dachepalli Publishers Limited, an educational publishing and integrated academic solutions…

Parsi Dairy Farm turns 110 and drops a Diwali rap

October 26, 2026

Pre-approved Loan Vs Instant Short-Term Loan: What’s the Difference and What Should Borrowers Compare?

October 26, 2026

RGIPT Celebrates 10th Convocation, Showcases Progress in Research, Innovation and Industry Collaboration

October 26, 2026
Most Popular

Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY

October 26, 2026

Can we guess, how much she is happy?

February 22, 2020

When sunrise and the day begins.

February 22, 2020
Categories
  • Business
  • Business News
  • Education
  • Entertainment
  • Finance
  • Health
  • Lifestyle
  • National
  • Press Release
  • Sports
  • Technology
  • Uncategorized
  • World
Our Picks

Dachepalli Publishers Limited Reports H1 FY27 Total Income of Rs 7,006 Lakh, Up 74% YoY

October 26, 2026

Parsi Dairy Farm turns 110 and drops a Diwali rap

October 26, 2026

Pre-approved Loan Vs Instant Short-Term Loan: What’s the Difference and What Should Borrowers Compare?

October 26, 2026

Type above and press Enter to search. Press Esc to cancel.